From Technical Challenges to Successful Implementation: A Record of a Low-Carbon Industrial Park Project
Introduction: Park Energy Management Enters a Refined Stage
Against the backdrop of continuous advancement of "dual carbon" goals, increasing volatility in industrial energy costs, and escalating demand for integrated park energy services, park energy management is shifting from traditional "meter reading, statistics, and settlement" to "real-time sensing, energy-efficiency optimization, energy conservation and carbon reduction, and safe operation." For comprehensive parks integrating advanced manufacturing, warehousing and logistics, and office ancillary facilities, energy systems are no longer merely ancillary facilities supporting production but critical infrastructure affecting operating costs, carbon-emission indicators, investment-attraction services, and long-term competitiveness.
This article uses an energy management project at a comprehensive advanced-manufacturing and logistics park in eastern China as an example to introduce a practical engineering case centered on an EMS (energy management system). The project covers multiple energy media including electricity, gas, cooling, heating, compressed air, lighting, photovoltaics, energy storage, and charging piles.
After commissioning, the project operated continuously for 12 months with significant results:
Key Performance Indicators
- Comprehensive Energy Saving: 11.6%
- Annual Electricity Savings: ~16.02 million kWh
- CO₂ Emission Reductions: ~10,800 tonnes
- Total Cost Decrease: ~RMB 9.86 million
- Dynamic Payback Period: ~3.7 years
Construction Scope
- On-site sensing-layer retrofit
- Edge gateway deployment
- Platform function development
- Chiller & Compressor group-control optimization
- Carbon accounting module commissioning
Project Background: Multi-format Parks Face Fragmented Energy Management
The park is located in a provincial-level advanced manufacturing cluster zone. Completed in 2016, it covers 28.4 hectares with a building area of approximately 196,000 m². It hosts 43 resident enterprises, including 18 above-scale manufacturing units, 9 logistics/warehousing firms, and 16 office/R&D facilities. Before retrofit, annual electricity consumption was ~138 million kWh, natural gas ~1.12 million m³, and cooling supply ~94,000 refrigeration ton-hours. Although 4.8 MWp of rooftop PV was installed, it had not been uniformly dispatched with park loads.
During preliminary investigation, the park operator identified four main issues:
- Insufficient Metering Coverage: Different energy media were managed by separate devices and platforms, leading to long manual cycles and inconsistent data definitions.
- Experience-Based Operations: Key systems like chillers and compressors operated at fixed parameters, lacking dynamic adjustment based on load or weather.
- Unintegrated Distributed Resources: PV and small energy storage assets were not part of unified dispatch, limiting their economic potential.
- Inadequate Carbon Accounting: Reliance on annual invoices and estimation coefficients lacked hourly, system-level data, failing to meet Scope 1 and 2 requirements for green low-carbon certification.
Consequently, the park management committee proposed building a park-level EMS platform alongside energy-saving retrofits. Objectives included establishing multi-energy metering, optimizing chiller/compressor/lighting/HVAC efficiency, reducing costs via demand management and peak-valley arbitrage, and creating a traceable carbon-emission model.
Technical Challenges: Multi-Energy Coupling and Data Silos
1. Multi-Energy Flow Coupling
Conversion relationships exist among electricity, gas, steam, cooling, and compressed air. Equipment efficiency varies with load rate, ambient temperature, and pipeline pressure. Monitoring only single carriers makes it difficult to identify system-level savings. For instance, chiller COP depends on pump frequency and tower approach, while compressor energy relates to leakage rates and intake temperature.
2. Data Silos and Protocol Complexity
Devices from different eras use inconsistent interfaces (DL/T 645, Modbus TCP, IEC 61850, BACnet, OCPP, etc.). Without a unified data model and edge gateways, the platform becomes a mere "data display wall" rather than an optimization tool.
3. Non-Intrusive On-Site Retrofit
With 24-hour continuous production lines, shutdowns for commissioning are impossible. Implementation required zone-based batch retrofit, nighttime window construction, bypass acquisition, and temporary dual-circuit arrangements to ensure secure links without disrupting operations.
4. Data Quality and Security
Old meters often have accuracy issues or incorrect transformer ratios. The team established a trusted data foundation through virtual metering and outlier cleaning. Simultaneously, strict network isolation (production vs. office), one-way uploads, and tiered permissions were implemented to prevent data leakage or control risks.
Solution: An EMS-Centered Park Energy Management Platform
The project adopts a layered architecture: On-site Sensing → Edge Gateway → Platform → Application → Optimization Execution.
Infrastructure Layer
- Sensing: Added/replaced 1,860 meters/sensors covering 12 factories, 3 substations, 3 chiller plants, and 2 compressor stations.
- Edge: Deployed 126 industrial-grade gateways for protocol conversion, buffering, and local rule computation.
- Data Frequency: Key equipment 1–5 mins; general sub-metering 15 mins; critical alarms second-level.
Application & Optimization Layer
- Unified Model: Converts all media into standard coal equivalents, carbon factors, and cost indicators.
- Group Control: Links EMS with chillers, compressors, lighting, and storage using load forecasting and efficiency curves.
- Carbon Module: Establishes Scope 1 & 2 accounting models using local grid baseline factors (0.5703 tCO₂/MWh).
The platform generates operating strategies based on total/sub-load, weather, production plans, and price structures. Strategies include dynamic adjustment of chiller unit counts and pump frequencies, pressure-band optimization for compressors, illuminance sensing for lighting, and "self-generation for self-consumption" logic for PV/storage.
Implementation: From Metering Retrofit to System Integration
The project spanned 9 months, divided into three phases:
Diagnosis & Modeling (Months 1-3)
Conducted on-site surveys, drew topology diagrams, sorted out metering boundaries for 43 enterprises, and identified 127 key energy-consuming devices. Produced functional specifications and optimization schemes for chillers, compressors, lighting, and storage.
Deployment & Implementation (Months 4-6)
Prioritized non-production-affecting methods. Installation occurred during nighttime low-load windows. Used bypass pipelines for water/gas meters. Ensured physical network isolation and whitelist communication for security.
Integration & Optimization (Months 7-9)
Started in "monitoring mode" (verified 99.2% data completeness), moved to "advisory mode" (manual confirmation of recommendations), and finally enabled "automatic mode" after 6 weeks of stable trial operation. Established O&M data governance mechanisms for abnormal events.
Post-implementation, monthly energy report preparation time decreased from 7 person-days to 0.5 person-days, and average fault localization time dropped from 4.5 hours to 28 minutes.
Energy-Efficiency Optimization Results
| System | Pre-Retrofit Status | Optimization Strategy | Post-Retrofit Result |
|---|---|---|---|
| Chiller Plants | Avg COP 2.3; Fixed temp strategy | Group control based on wet-bulb temp, load rate, and efficiency curves | COP improved to 3.1; 18.4% electricity saving |
| Compressors | Pressure 0.70-0.74 MPa; Leakage ~18% | Pressure band optimized to 0.62-0.66 MPa; VFD priority; Leak monitoring | Leakage reduced to 7%; Unit energy down to 0.093 kWh/Nm³ |
| Lighting & HVAC | Traditional lamps; Manual HVAC setpoints | LED replacement + occupancy/daylight sensors; Temp setpoint adjustments | 38% lighting saving; 12.7% HVAC electricity reduction |
PV-Storage Coordination and Demand Management
The park's 4.8 MWp PV system was previously disconnected from load dispatch. The new EMS incorporated PV, 2 MW/4 MWh lithium iron phosphate storage, and charging piles into unified dispatch using a "self-generation for self-consumption, peak-valley arbitrage, and demand suppression" strategy.
In terms of charging piles (18 AC, 4 DC), orderly charging strategies reduced power during peak prices and increased it when PV output was high. This flattened demand fluctuations without increasing transformer capacity. Daily utilization remained steady at ~41%, with peak-period charging load decreasing by 18%.
Final Results and Outlook
After 12 months of operation, third-party verification confirmed the following achievements:
Quantified Impact Summary
- Comprehensive Energy Saving Rate: 11.6%
- Annual Electricity Savings: ~16.02 million kWh
- Annual CO₂ Reduction: ~10,800 tonnes
- Total Annual Benefit: ~RMB 9.86 million (Energy costs + Arbitrage + O&M efficiency)
- Dynamic Payback Period: ~3.7 years
Beyond direct economics, the project transformed management practices. The EMS shifted operations from "post-hoc statistics" to "real-time sensing and forward-looking forecasting." During the year, 486 energy-saving recommendation work orders were generated, with 372 adopted, forming a closed-loop improvement mechanism. Resident enterprises saw unit product energy consumption drop by ~6.8% due to optimized shift startups and compressor usage.
From a dual-carbon perspective, the platform established a verifiable data foundation for Scope 1 and 2 emissions, supporting green electricity trading and carbon-footprint disclosure. Interfaces for Scope 3 emissions (transportation, waste) have been reserved for future expansion.
Future Directions
Looking ahead, park energy management will move toward system coordination and regionalized operations. Next-phase explorations include Virtual Power Plants (VPP), demand response participation, shared energy storage, and distributed trading. By introducing machine-learning algorithms for continuous training of load forecasting and fault prediction, the platform aims to improve energy-saving benefits over time. Ultimately, this demonstrates that the value of park EMS lies not just in software, but in closing the loop between metering, control, algorithms, and operational mechanisms to achieve measurable, reportable, and verifiable sustainability goals.