What safety measures are required for high-altitude installation of LGF electromagnetic flowmeters?

LGF electromagnetic flowmeter high-altitude installation requires safety plans, protective equipment, and certified personnel.

High-altitude installation of LGF electromagnetic flowmeters demands strict adherence to safety protocols to protect personnel and equipment. A comprehensive safety work plan must be developed, including risk assessment and emergency procedures.

  • Use certified safety harnesses, ropes, and fall protection equipment; only certified personnel allowed
  • Erect stable scaffolding or use professional lifting equipment with adequate load capacity
  • Deploy professional hoisting equipment for large diameter flowmeters DN500+ to avoid manual handling
  • Prohibit work during adverse weather conditions (wind ≥6 grade, rain, snow)
  • Establish safety perimeter zones with dedicated safety supervisors

For HZ-KSLF radar flowmeters and other non-contact devices, consider measurement angles and mounting heights to ensure both safety compliance and measurement accuracy. Proper installation procedures guarantee optimal performance of the FMCW radar technology.

Installation & Commissioning