Should I choose electromagnetic or ultrasonic flow meters for urban drainage monitoring?
Full pipe = electromagnetic (±0.5%), partial pipe = radar (non-contact, maintenance-free). Consider fullness, water quality, installation, and maintenance
For urban drainage monitoring, the choice between electromagnetic and ultrasonic flow meters depends on your specific application. For full-pipe pressurized flows (pump station outlets, trunk mains), LGF electromagnetic flow meters deliver ±0.5% accuracy for high-precision metering. For partially filled pipes with sediment and debris, HZ-KSLF Doppler radar flow meters offer non-contact measurement unaffected by water quality.
Key factors: 1) Pipe fullness — full pipe use electromagnetic, partial pipe use radar; 2) Water quality — radar tolerates high sediment better; 3) Installation — electromagnetic requires shutdown, radar allows hot-tap; 4) Maintenance — non-contact radar is maintenance-free.
CSSOC provides complete solutions: LGF electromagnetic (DN10-DN2000) + HZ radar flow meters with EC32/EC60 RTU systems for network-wide monitoring.